A number of streets in the Tierrasanta area are scheduled for slurry sealing or AC Paving this fall and winter.
By date range, they are as follows:
AC1512 AC PAVING 9/1/16 thru 1/1/17
AC1601 AC PAVING 11/15/16 thru 4/15/17 --Slurry Schedule
AC1601 AC PAVING 11/15/16 thru 4/15/17--AC Paving